Repetitive Project Scheduling: Theory and Methods
Autor: | Li-hui Zhang |
---|---|
EAN: | 9780128018316 |
eBook Format: | PDF/ePUB |
Sprache: | Englisch |
Produktart: | eBook |
Veröffentlichungsdatum: | 02.07.2015 |
Kategorie: | |
Schlagworte: | LOB RCPSP backward controlling segment controlling path crew synchronization criticality distance constraint engineering management gene natural rhythm network planning technique optimum crew size precedence relations resource allocation |
78,95 €*
Versandkostenfrei
Die Verfügbarkeit wird nach ihrer Bestellung bei uns geprüft.
Bücher sind in der Regel innerhalb von 1-2 Werktagen abholbereit.
Repetitive Project Scheduling: Theory and Methods is the first book to comprehensively, and systematically, review new methods for scheduling repetitive projects that have been developed in response to the weaknesses of the most popular method for project scheduling, the Critical Path Method (CPM). As projects with significant levels of repetitive scheduling are common in construction and engineering, especially construction of buildings with multiple stories, highways, tunnels, pipelines, power distribution networks, and so on, the book fills a much needed gap, introducing the main repetitive project scheduling methods, both comprehensively and systematically. Users will find valuable information on core methodologies, including how to identify the controlling path and controlling segment, how to convert RSM to a network model, and examples based on practical scheduling problems. - Introduces the repetitive scheduling method with analysis of the pros and cons, as well as the latest developments - Discusses the two basic theoretical topics, identifying the controlling path and transferring the RSM to a network model - Focuses on practical problems and algorithms - Provides an essential resource for researchers, managers, and engineers in the field of engineering project and construction management
Li-Hui Zhang is an associate professor in School of Economics and Management, North China Electric Power University (NCEPU), with extensive teaching and project management and operations research experience for 12 years. He has published more than 30 papers (in Chinese and English) and 3 books (in Chinese) in these areas. The proposed book research was supported by the National Natural Science Foundation of China.
Li-Hui Zhang is an associate professor in School of Economics and Management, North China Electric Power University (NCEPU), with extensive teaching and project management and operations research experience for 12 years. He has published more than 30 papers (in Chinese and English) and 3 books (in Chinese) in these areas. The proposed book research was supported by the National Natural Science Foundation of China.